| No | Kode Rincian | Uraian | Penerima | Rekening | Pembayaran | Sumber Dana |
|---|---|---|---|---|---|---|
| 1 | 5.3.9.99. | Belanja paket paving terpasang 34 M2, Rehab PAUD Kedungbuweng. Nota terlampir | Tb Giriarto | - | 4.800.000 | PBK |
| 5.3.9.99. Belanja Modal Lainnya (Sub Jumlah) : | 4.800.000 | |||||
| Total Keseluruhan: | 4.800.000 | |||||